| 
																Lin, Ka Yuk Carrie  / Optimizing variable selection and neighbourhood size in the K-nearest neighbour algorithm. May  2024; In: Computers & Industrial Engineering. Vol. 191Young, Ching Han; Lau, Siu Hin; Lin, Ka Yuk Carrie  / Employment survey of wheelchair users and influential factors identified in a social enterprise in Hong Kong. December  2022; In: European Journal of Business and Management Research. Vol. 7, No. 6, pp. 268-275Lin, Carrie Ka Yuk  / Integrated capacity and appointment scheduling strategy for access time management. September  2021; In: International Journal of Business and Economic Development. Vol. 2, No. 3, pp. 1-15Lin, Carrie Ka Yuk  / Dynamic appointment scheduling with forecasting and priority-specific access time service level standards. September  2019; In: Computers and Industrial Engineering. Vol. 135, pp. 970-986Lin, Carrie Ka Yuk ; Ling, Teresa Wai Ching; YEUNG, Wing Kwan  / Resource Allocation and Outpatient Appointment Scheduling Using Simulation Optimization. September  2017; In: Journal of Healthcare Engineering. Vol. 2017NG, Wing Cheong Jonathan; LIN, Ka Yuk Carrie  / Planning the capacity of a hospital lift system. October  2016; In: International Journal of Innovation, Management and Technology. Vol. 7, No. 5, pp. 196-199LIN, Ka Yuk Carrie  / An adaptive scheduling heuristic with memory for the block appointment system of an outpatient specialty clinic. September  2015; In: International Journal of Production Research. Vol. 53, No. 24, pp. 7488-7516Lin, Carrie Ka Yuk  / Solving a location, allocation, and capacity planning problem with dynamic demand and response time service level. August  2014; In: Mathematical Problems in Engineering. Vol. 2014Lin, C. K Y  / A vehicle routing problem with pickup and delivery time windows, and coordination of transportable resources. November  2011; In: Computers and Operations Research. Vol. 38, No. 11, pp. 1596-1609Lin, C. K Y  / Stochastic single-source capacitated facility location model with service level requirements. February  2009; In: International Journal of Production Economics. Vol. 117, No. 2, pp. 439-451Lin, C. K Y  / A cooperative strategy for a vehicle routing problem with pickup and delivery time windows. November  2008; In: Computers and Industrial Engineering. Vol. 55, No. 4, pp. 766-782Lin, C. K Y; Kwok, R. C W  / Multi-objective metaheuristics for a location-routing problem with multiple use of vehicles on real data and simulated data. December  2006; In: European Journal of Operational Research. Vol. 175, No. 3, pp. 1833-1849Chu, Sydney C.K.; Lin, C. K Y; Lam, S. S.  / Hospital lift system simulator: A performance evaluator-predictor. April  2003; In: European Journal of Operational Research. Vol. 146, No. 1, pp. 156-180Lin, C. K Y; Wong, C. L.; Yeung, Y. C.  / Heuristic approaches for a scheduling problem in the plastic molding department of an audio company. September  2002; In: Journal of Heuristics. Vol. 8, No. 5, pp. 515-540Lin, C. K Y; Chow, C. K.; Chen, A.  / A location-routing-loading problem for bill delivery services. July  2002; In: Computers and Industrial Engineering. Vol. 43, No. 1-2, pp. 5-25Lin, C. K Y; Lai, K. F.; Hung, S. L.  / Development of a workforce management system for a customer hotline service. September  2000; In: Computers and Operations Research. Vol. 27, No. 10, pp. 987-1004Lin, C. K. Y.  / Analysis of quota assignment and time block duration in multi-block appointment systems. March  2000; In: IMA Journal of Management Mathematics. Vol. 11, No. 2, pp. 85-99Lin, C. K Y  / Development of a workforce management system for a hotline service. October  1999; In: Computers and Industrial Engineering. Vol. 37, No. 1, pp. 465-468Lin, C. K.  / Microcomputer-based workforce scheduling for hospital porters.. 1999; In: Journal of Management in Medicine. Vol. 13, No. 4-5, pp. 251-262C.K.Y. Lin, Ka Yuk Carrie; Haley, K. B.; Sparks, C.  / A comparative study of both standard and adaptive versions of threshold accepting and simulated annealing algorithms in three scheduling problems. June  1995; In: European Journal of Operational Research. Vol. 83, No. 2, pp. 330-346Chu, Sydney C K; Lin, Carrie K Y  / Cohort analysis technique for long-term manpower planning: The case of a Hong Kong tertiary institution. June  1994; In: Journal of the Operational Research Society. Vol. 45, No. 6, pp. 696-709Chu, Sydney C K; Lin, Carrie K Y  / A Manpower allocation model of job specialization. October  1993; In: Journal of the Operational Research Society. Vol. 44, No. 10, pp. 983-989Lin, C. K Y; Haley, K. B.  / Scheduling two-phase jobs with arbitrary time lags in a single-server system. 1993; In: IMA Journal of Management Mathematics. Vol. 5, No. 1, pp. 143-161Chu, Sydney C K; Lin, Carrie K Y; Ng, Kevin Y K  / Centralized versus decentralized manpower resource planning. The case of a Hong Kong company. July  1991; In: Journal of the Operational Research Society. Vol. 42, No. 7, pp. 525-536 |